OH Consultant
← Permit to Work/General & Commercial/Permit-to-Work System & Framework
Single document · General & CommercialPTW-L-001

Permit-to-Work System & Framework Template

Permit-to-Work System & Framework

General & Commercial edition

$250AUDBuy now — editable Word

The governing procedure: roles, when a permit is required, and how permits are issued, controlled and closed out. Low Hazard edition — editable Word document with its permit form built in. Choose your state at checkout.

✓1 editable Word document✓Fillable permit form built in✓Jurisdiction-specific reference✓Same price across 8 states
Running a permit system, not a single permit?

The General & Commercial pack is the full permit-to-work system: this permit, the framework and every other permit in the tier. 7 editable Word documents for $1,020 AUD.

See the General & Commercial pack — $1,020
$250 AUD✓ Instant Download · 1 doc
Instant download (.docx)
Editable Microsoft Word
CIH-reviewed · WHS/OHS aligned
Pay once · no subscription
Permit-to-Work System & Framework — General & Commercial

What this permit controls

The master document that establishes your permit-to-work system: who can request, issue, authorise and close permits; when a permit is required; how permits are controlled, displayed, suspended, extended and handed back; and how contractors are brought into the system. Every other permit operates under this framework.

Typical work covered

  • ✓Setting up the PTW system for a new site
  • ✓Inducting a new contractor or sub-trade onto the system
  • ✓Defining "permit-required work" categories for your operations
  • ✓Audit and management review of the PTW system
  • ✓Training the issuer, holder and witness roles
  • ✓Integrating PTW with SWMS and JSEAs already in use

Hazards this permit addresses

Each hazard is identified on the permit form with the controls that must be in place before the issuer signs.

H01No clear permit-required-work list

Outcome if uncontrolled: High-risk work runs without authorisation.

H02Issuer and holder competencies undefined

Outcome if uncontrolled: Unqualified personnel signing permits.

H03No audit cadence

Outcome if uncontrolled: Drift from procedure; permits closed without verification.

H04Contractors not inducted to the system

Outcome if uncontrolled: Parallel uncontrolled work on site.

What the permit form includes

Editable Microsoft Word form. Yellow cells are the only ones you complete on a typical job. Sections:

01
Roles and responsibilities — issuer, receiver, authoriser, affected persons
02
When a permit is and isn't required
03
Permit lifecycle — request, issue, display, suspend, extend, close
04
Isolation and lock-out principles
05
Contractor induction and interface into the system
06
Record-keeping and audit requirements

How to use this permit

1
Adopt and brand

Add company name and ABN; tune the permit-required work list to your operations; nominate issuers.

2
Train and induct

Train nominated issuers, holders and witnesses; induct contractors before they engage with the system.

3
Operate

Issue permits per the framework, log in the register, witness close-outs.

4
Audit and review

Run the audit checklist on the cadence defined in the framework. Update the system at management review.

Frequently asked

What format is it in?

Editable Microsoft Word (.docx) with its permit form built in. Bracketed [fields] mark where to add your business name, ABN, site details and authorising officers.

Which jurisdiction do I get?

You choose your state at checkout (NSW, VIC, QLD, WA, SA, TAS, ACT or NT). The document references the Act, regulator and code of practice in force there — Victoria on OHS, the rest on harmonised WHS.

Is it cheaper in the pack?

Yes — the Low-Hazard Pack bundles 7 documents for $1,020. Buying singles is best when you need only one or two.

Do I still need review?

Yes. This is a starting-point template; customise it to your site and have a competent person review it, in consultation with workers, before issuing live permits.

The complete General & Commercial permit-to-work system

One pack holds all 7 documents below, so every permit is issued, controlled and closed out on the same set of forms.

  • ✓Permit-to-Work System & Framework (this page)
  • ✓General Work Permit
  • ✓Hot Work & Fire Watch Permit (AS 1674.1)
  • ✓Electrical Isolation & De-energised Work Permit
  • ✓Working at Heights & Fall Protection Permit (>2m)
  • ✓Confined Space Entry & Rescue Permit (AS 2865)
  • ✓Specialist Contractor Interface
General & Commercial pack
$1,020AUD

7 editable Word documents for your state. One-off payment.

See the General & Commercial pack

Or buy this permit on its own for $250.

Other general & commercial permits

PTW-L-002
General Work Permit
$150 →
PTW-L-003
Hot Work & Fire Watch Permit (AS 1674.1)
$150 →
PTW-L-004
Electrical Isolation & De-energised Work Permit
$150 →
PTW-L-005
Working at Heights & Fall Protection Permit (>2m)
$150 →
PTW-L-006
Confined Space Entry & Rescue Permit (AS 2865)
$150 →
PTW-L-007
Specialist Contractor Interface
$200 →

A Permit-to-Work Management System supplied as editable Microsoft Word documents, built to comply with the harmonised model WHS laws and Victoria's OHS Act 2004. Compliance is achieved by implementing and maintaining the system and having it reviewed by a competent person, in consultation with workers, for your site, plant and personnel; final responsibility under the legislation remains with the PCBU. Licensed for use within the purchasing organisation only. To the maximum extent permitted by law, the vendor's liability is limited to the price paid.