OH Consultant
← Permit to Work/General & Commercial/Electrical Isolation & De-energised Work Permit
Single document · General & CommercialPTW-L-004

Electrical Isolation & De-energised Work Permit Template

Electrical Isolation & De-energised Work Permit

General & Commercial edition

$150AUDBuy now — editable Word

Authorises isolation and lock-out before de-energised electrical work on boards and fixed plant. Low Hazard edition — editable Word document with its permit form built in. Choose your state at checkout.

✓1 editable Word document✓Fillable permit form built in✓Jurisdiction-specific reference✓Same price across 8 states
Running a permit system, not a single permit?

The General & Commercial pack is the full permit-to-work system: this permit, the framework and every other permit in the tier. 7 editable Word documents for $1,020 AUD.

See the General & Commercial pack — $1,020
$150 AUD✓ Instant Download · 1 doc
Instant download (.docx)
Editable Microsoft Word
CIH-reviewed · WHS/OHS aligned
Pay once · no subscription
Electrical Isolation & De-energised Work Permit — General & Commercial

What this permit controls

Authorises isolation and lock-out before de-energised electrical work — proving dead, applying locks and tags, and controlling re-energisation. For boards, fixed plant and equipment.

Typical work covered

  • ✓Maintenance on switchboards, motors, drives
  • ✓Cable repair and termination work
  • ✓Lighting and small-power fit-out
  • ✓Repairs in service-yard or plant rooms
  • ✓Replacing components in installed equipment

Hazards this permit addresses

Each hazard is identified on the permit form with the controls that must be in place before the issuer signs.

H01Inadvertent re-energisation during work

Outcome if uncontrolled: Electrocution, arc flash burns.

H02Stored energy in capacitors not discharged

Outcome if uncontrolled: Shock on contact after isolation.

H03Wrong circuit isolated (mis-labelled board)

Outcome if uncontrolled: Worker contacts live equipment believing it dead.

H04Test-instrument failure / wrong rating

Outcome if uncontrolled: False "dead" reading; electrocution.

H05Backfeed from UPS, generator, solar inverter

Outcome if uncontrolled: Energy returns from downstream source.

H06Working alone with no fall-back

Outcome if uncontrolled: No witness for emergency response.

What the permit form includes

Editable Microsoft Word form. Yellow cells are the only ones you complete on a typical job. Sections:

01
Isolation points and lock-out/tag-out record
02
Prove-dead / test-before-touch steps
03
Authorised electrical worker verification
04
Re-energisation control
05
PPE and test-equipment requirements
06
Authorisation and close-out

How to use this permit

1
Identify and isolate

Identify the correct isolation point. Operate the isolator to OFF. Apply personal lockout device and tag.

2
Test for dead

Use a tested live instrument: confirm live on known-live circuit → test the isolated equipment (must read dead) → re-test on known-live to confirm instrument still working.

3
Discharge stored energy

For capacitor banks, large drives, UPS systems — follow the discharge procedure before contact.

4
Work

Each worker applies their own lock to the multi-hasp. Work proceeds. Issuer remains contactable.

5
Re-energise

All locks removed by their owner. Final inspection. Permit holder authorises re-energisation. Sign close-out.

Frequently asked

What format is it in?

Editable Microsoft Word (.docx) with its permit form built in. Bracketed [fields] mark where to add your business name, ABN, site details and authorising officers.

Which jurisdiction do I get?

You choose your state at checkout (NSW, VIC, QLD, WA, SA, TAS, ACT or NT). The document references the Act, regulator and code of practice in force there — Victoria on OHS, the rest on harmonised WHS.

Is it cheaper in the pack?

Yes — the Low-Hazard Pack bundles 7 documents for $1,020. Buying singles is best when you need only one or two.

Do I still need review?

Yes. This is a starting-point template; customise it to your site and have a competent person review it, in consultation with workers, before issuing live permits.

The complete General & Commercial permit-to-work system

One pack holds all 7 documents below, so every permit is issued, controlled and closed out on the same set of forms.

  • ✓Permit-to-Work System & Framework
  • ✓General Work Permit
  • ✓Hot Work & Fire Watch Permit (AS 1674.1)
  • ✓Electrical Isolation & De-energised Work Permit (this page)
  • ✓Working at Heights & Fall Protection Permit (>2m)
  • ✓Confined Space Entry & Rescue Permit (AS 2865)
  • ✓Specialist Contractor Interface
General & Commercial pack
$1,020AUD

7 editable Word documents for your state. One-off payment.

See the General & Commercial pack

Or buy this permit on its own for $150.

Other general & commercial permits

PTW-L-001
Permit-to-Work System & Framework
$250 →
PTW-L-002
General Work Permit
$150 →
PTW-L-003
Hot Work & Fire Watch Permit (AS 1674.1)
$150 →
PTW-L-005
Working at Heights & Fall Protection Permit (>2m)
$150 →
PTW-L-006
Confined Space Entry & Rescue Permit (AS 2865)
$150 →
PTW-L-007
Specialist Contractor Interface
$200 →

A Permit-to-Work Management System supplied as editable Microsoft Word documents, built to comply with the harmonised model WHS laws and Victoria's OHS Act 2004. Compliance is achieved by implementing and maintaining the system and having it reviewed by a competent person, in consultation with workers, for your site, plant and personnel; final responsibility under the legislation remains with the PCBU. Licensed for use within the purchasing organisation only. To the maximum extent permitted by law, the vendor's liability is limited to the price paid.