OH Consultant
← Permit to Work/Construction & Manufacturing/General Work Permit
Single document · Construction & ManufacturingPTW-M-002

General Work Permit Template

General Work Permit

Construction & Manufacturing edition

$200AUDBuy now — editable Word

Everyday control for non-routine tasks that don't fall under a specific high-risk permit. Medium Hazard edition — editable Word document with its permit form built in. Choose your state at checkout.

✓1 editable Word document✓Fillable permit form built in✓Jurisdiction-specific reference✓Same price across 8 states
Running a permit system, not a single permit?

The Construction & Manufacturing pack is the full permit-to-work system: this permit, the framework and every other permit in the tier. 10 editable Word documents for $1,825 AUD.

See the Construction & Manufacturing pack — $1,825
$200 AUD✓ Instant Download · 1 doc
Instant download (.docx)
Editable Microsoft Word
CIH-reviewed · WHS/OHS aligned
Pay once · no subscription
General Work Permit — Construction & Manufacturing

What this permit controls

Authorises and controls non-routine tasks that don't fall under a specific high-risk permit — general maintenance, minor works and contractor activities. The catch-all that ensures even ordinary work is assessed and authorised before it starts.

Typical work covered

  • ✓Routine maintenance and minor repairs
  • ✓Plant inspections and condition checks
  • ✓Cleaning and housekeeping work
  • ✓Office / amenity fit-out work
  • ✓Work that doesn't meet permit-required thresholds but still needs control

Hazards this permit addresses

Each hazard is identified on the permit form with the controls that must be in place before the issuer signs.

H01Unsupervised work in occupied or operating areas

Outcome if uncontrolled: Interface incidents with site activity.

H02Hazards not identified before work starts

Outcome if uncontrolled: Worker exposure to uncontrolled hazards.

H03Wrong tool / equipment for the task

Outcome if uncontrolled: Equipment damage, injury.

H04No coordination with other trades on site

Outcome if uncontrolled: Multi-trade interface incidents.

What the permit form includes

Editable Microsoft Word form. Yellow cells are the only ones you complete on a typical job. Sections:

01
Task and location details
02
Hazard identification and controls checklist
03
PPE requirements
04
Authorisation and acceptance sign-offs
05
Permit period, extension and close-out

How to use this permit

1
Describe and assess

Worker describes the task and identifies hazards.

2
Issuer review

Supervisor reviews, confirms controls are adequate, signs.

3
Work and close out

Worker proceeds; signs close-out at end. Permit retained for audit.

Frequently asked

What format is it in?

Editable Microsoft Word (.docx) with its permit form built in. Bracketed [fields] mark where to add your business name, ABN, site details and authorising officers.

Which jurisdiction do I get?

You choose your state at checkout (NSW, VIC, QLD, WA, SA, TAS, ACT or NT). The document references the Act, regulator and code of practice in force there — Victoria on OHS, the rest on harmonised WHS.

Is it cheaper in the pack?

Yes — the Medium-Hazard Pack bundles 10 documents for $1,825. Buying singles is best when you need only one or two.

Do I still need review?

Yes. This is a starting-point template; customise it to your site and have a competent person review it, in consultation with workers, before issuing live permits.

The complete Construction & Manufacturing permit-to-work system

One pack holds all 10 documents below, so every permit is issued, controlled and closed out on the same set of forms.

  • ✓Permit-to-Work System & Framework
  • ✓General Work Permit (this page)
  • ✓Hot Work & Fire Watch Permit (AS 1674.1)
  • ✓Energised Electrical Work Permit (AS/NZS 4836)
  • ✓Working at Heights & Fall Protection Permit (>2m)
  • ✓Confined Space Entry & Rescue Permit (AS 2865)
  • ✓Excavation & Ground Penetration Permit (>1.5m)
  • ✓Crane Critical Heavy Lift Permit (>80% Capacity)
  • ✓Complex Scaffolding & Suspended Stage Permit (AS/NZS 1576)
  • ✓Specialist Contractor Interface
Construction & Manufacturing pack
$1,825AUD

10 editable Word documents for your state. One-off payment.

See the Construction & Manufacturing pack

Or buy this permit on its own for $200.

Other construction & manufacturing permits

PTW-M-001
Permit-to-Work System & Framework
$300 →
PTW-M-003
Hot Work & Fire Watch Permit (AS 1674.1)
$200 →
PTW-M-004
Energised Electrical Work Permit (AS/NZS 4836)
$200 →
PTW-M-005
Working at Heights & Fall Protection Permit (>2m)
$200 →
PTW-M-006
Confined Space Entry & Rescue Permit (AS 2865)
$200 →
PTW-M-007
Excavation & Ground Penetration Permit (>1.5m)
$200 →

A Permit-to-Work Management System supplied as editable Microsoft Word documents, built to comply with the harmonised model WHS laws and Victoria's OHS Act 2004. Compliance is achieved by implementing and maintaining the system and having it reviewed by a competent person, in consultation with workers, for your site, plant and personnel; final responsibility under the legislation remains with the PCBU. Licensed for use within the purchasing organisation only. To the maximum extent permitted by law, the vendor's liability is limited to the price paid.