Single document · Heavy Industry & Energy SectorPTW-H-010

Demolition Permit

Heavy Industry & Energy Sector edition

Controls structural demolition — engineering survey, sequencing, services isolation, asbestos clearance, exclusion zones and overhead-line clearances. High Hazard edition — editable Word document with its permit form built in. Choose your state at checkout.

1 editable Word documentFillable permit form built inJurisdiction-specific referenceSame price across 8 states
Need three or more permits from this tier? The Heavy Industry & Energy Sector pack gives you all 11 for $2,419 — a 15% bundle saving.
$250 AUD✓ Instant Download · 1 doc
Instant download (.docx)
Editable Microsoft Word
CIH-reviewed · WHS/OHS aligned
Pay once · no subscription
Demolition Permit — Heavy Industry & Energy Sector

What this permit controls

Controls structural demolition — engineering survey, demolition sequence/method, services isolation, asbestos and hazardous-material clearance, exclusion zones and overhead-power-line clearances. The high-consequence controls demolition demands.

Typical work covered

  • Full building demolition (mechanical, manual, controlled)
  • Internal strip-out and structural alteration
  • Tower / chimney drop
  • Industrial plant removal
  • Selective / surgical demolition for refurbishment

Hazards this permit addresses

Each hazard is identified on the permit form with the controls that must be in place before the issuer signs.

H01Structural collapse during cutting / pulling

Outcome if uncontrolled: Burial, crush, fatalities.

H02Asbestos and silica dust release

Outcome if uncontrolled: Long-term occupational disease (mesothelioma, silicosis).

H03Falling debris and projectiles

Outcome if uncontrolled: Struck-by injuries to crew and adjacent properties.

H04Live electrical / gas / water services not isolated

Outcome if uncontrolled: Electrocution, fire, flood.

H05Plant–worker interface in confined demolition path

Outcome if uncontrolled: Crush by demolition plant.

H06Noise and vibration above exposure limits

Outcome if uncontrolled: Hearing loss, HAVS, community complaint.

What the permit form includes

Editable Microsoft Word form. Yellow cells are the only ones you complete on a typical job. Sections:

01
Demolition details, structure and method
02
Engineering survey and sequence confirmation
03
Services isolation and asbestos clearance
04
Air monitoring — dust / silica
05
Exclusion zones and overhead-line clearance table
06
Guidance notes and signatories

How to use this permit

1
Survey and plan

Hazmat survey complete. Demolition plan signed by structural engineer. Services confirmed isolated and removed in writing.

2
Establish controls

Exclusion zone, dust suppression, scaffold / protection for adjacent property. Brief neighbours.

3
Sequence demolition

Work top-down or in the structural sequence the engineer specified. Daily structural check before continuing.

4
Manage waste streams

Segregate hazardous (asbestos, lead) from general. Confirm disposal manifests.

5
Close out

Site cleared, final hazmat clearance, no residual instability. Sign close-out.

Frequently asked

What format is it in?

Editable Microsoft Word (.docx) with its permit form built in. Bracketed [fields] mark where to add your business name, ABN, site details and authorising officers.

Which jurisdiction do I get?

You choose your state at checkout (NSW, VIC, QLD, WA, SA, TAS, ACT or NT). The document references the Act, regulator and code of practice in force there — Victoria on OHS, the rest on harmonised WHS.

Is it cheaper in the pack?

Yes — the High-Hazard Pack bundles 11 documents for $2,419 with a 15% saving. Buying singles is best when you need only one or two.

Do I still need review?

Yes. This is a starting-point template; customise it to your site and have a competent person review it, in consultation with workers, before issuing live permits.

Other heavy industry & energy sector permits

PTW-H-001
Permit-to-Work System & Framework
$350
PTW-H-002
General Work Permit
$250
PTW-H-003
Hot Work Permit
$250
PTW-H-004
Electrical Work Permit
$250
PTW-H-005
Working at Height Permit
$250
PTW-H-006
Confined Space Entry Permit
$250

A Permit-to-Work Management System supplied as editable Microsoft Word documents, built to comply with the harmonised model WHS laws and Victoria's OHS Act 2004. Compliance is achieved by implementing and maintaining the system and having it reviewed by a competent person, in consultation with workers, for your site, plant and personnel; final responsibility under the legislation remains with the PCBU. Licensed for use within the purchasing organisation only. To the maximum extent permitted by law, the vendor's liability is limited to the price paid.